Basement Remodelers in Lancaster: A finished basement that starts with the water, not the paint

Free measure and a scale drawing, drainage and a vapor barrier before any framing, and the permit filed by us rather than by you.

Basement Remodelers in Lancaster, PA

Basement remodeling in Lancaster leaves you another floor of the house, dry in March, warm in January, and lived in the rest of the year.

A close view of steel stud framing standing an inch clear of a gray block basement wall, with pale spray foam filling the gap behind the studs.

Lancaster Basement Pros is a basement remodeling contractor in Lancaster, finishing about thirty basements a year since 2009 and traveling out to Lititz, Ephrata and Mount Joy. Two crews run at once, and the book sits four to six weeks ahead.

Most of it is full basement finishing, bare block through to painted rooms and a signed permit. Under that comes waterproofing and moisture control, then egress and code compliance, basement bathrooms and bars, and apartments and in-law suites.

Walls go up in 20-gauge steel an inch clear of the block, closed-cell foam behind them as the Class II vapor retarder, so no wood sits on masonry and a damp spring never shows as a stain on your paint.

Is one room downstairs too small a job for basement remodeling? Basement remodeling that size is a normal booking, and a landlord in Columbia wanting a code bedroom and a shower room is a fortnight, while a suite, a bar and a theater for a family runs most of a summer.

Ask Lancaster Basement Pros for a free measure at (717) 555-0162, for basement remodeling in Lancaster, Lititz, Ephrata and Mount Joy. Somebody comes out, measures the height and the water, and the drawing is yours either way.

Every basement job on our books in Lancaster

  • Basement Finishing
  • Framing and Insulation
  • Basement Flooring
  • Basement Ceilings and Lighting
  • Basement Waterproofing
  • Sump Pumps and Drainage
  • Vapor Barriers and Dehumidification
  • Egress Window Installation
  • Basement Stairs and Access
  • Permits and Code Upgrades
  • Basement Bathroom Installation
  • Wet Bars and Kitchenettes
  • Ejector Pumps and Below-Grade Plumbing
  • Basement Apartments and In-Law Suites
  • Home Theater and Media Rooms
  • Soundproofing and Separation
Curt and Anita Hershey standing side by side in black work shirts against a plain gray backdrop, both smiling at the camera
Lancaster Basement Pros monogram Curt and Anita Hershey Founders and owners

Who we are

The people who do the work in Lancaster basements

We have been finishing basements in Lancaster and the county around it since 2009, about thirty a year. Seventeen years down there, and the work still comes down to dealing with the water before a stud goes up.

Two crews, one contract from bare block to a signed permit. We file the drawings with your township and stand with the inspector, and the steel stands an inch clear of the block so no wood sits on masonry.

Why trust us

  • Drainage, framing, the egress window and the permit are all ours
  • About thirty basements a year around Lancaster since 2009
  • You never chase a township inspection or a trade yourself

Services

Basement remodeling services in Lancaster County

  • A basement part way through finishing, with steel stud walls standing on a bare concrete slab, pale insulation on the masonry behind them

    Full Basement Finishing

    For the family in a split level that has run out of bedrooms and does not want to move, and for the owner of a ranch who is tired of a whole floor of the house being used as a shed. This is the finish itself rather than the water underneath it or the plumbing in it. Framing, insulation, floor, ceiling and lighting, done in a way that keeps the head height you actually have.

    Learn more about Full Basement Finishing
  • A dry basement with a bare gray block wall, a clean swept concrete floor, and a white sealed sump lid set into the slab with a discharge pipe rising out of it.

    Waterproofing and Moisture Control

    For the owner who has mopped the same corner every March since they moved in, and for the buyer whose inspection report has water infiltration written on it in a house they still want. This is the half that goes in before any framing. Where the water arrives, where it gets sent, and what keeps the air down there dry once it has gone.

    Learn more about Waterproofing and Moisture Control
  • A finished basement bedroom with a wide egress window set into the wall, the sash swung open

    Egress and Code Compliance

    For anybody who has been told the room downstairs does not count. A family adding a bedroom for a teenager, a landlord with a basement room let out, somebody selling a house where the finished basement was never filed. People pick this because the window is the one part of a basement nobody can talk their way around. It either measures or it does not.

    Learn more about Egress and Code Compliance
  • A finished basement bathroom with a tiled shower, a vanity with a stone top and a lit mirror over it, the door standing open onto the finished basement beyond

    Basement Bathrooms and Bars

    For anybody who wants a bathroom or a bar downstairs and has been told it is complicated. Families finishing a basement so nobody has to run up two flights, and owners who found a rough-in in the slab and never knew what it was for. People pick this because the plumbing is the part that decides whether the room happens at all.

    Learn more about Basement Bathrooms and Bars
  • An open plan basement apartment with a small kitchen along one wall, a sofa, a rug and a lamp, and a door in the far wall leading out

    Apartments and In-Law Suites

    For anybody turning a basement into somewhere separate rather than into another room. Families moving a parent in and wanting them independent, owners making a unit out of a dead floor, and people who want a theater nobody upstairs can hear. They pick this because the separation is the difficult half and everything else down there is ordinary building.

    Learn more about Apartments and In-Law Suites

Nothing organic is left touching masonry, anywhere

Steel framing, closed-cell foam on the block, and the wet dealt with before a single stud is stood up.

Walls go up in 20-gauge galvanized steel on a treated bottom track, set an inch clear of the masonry, and that inch is what stops a wet spring showing up later as a stain on your paint.

Two inches of closed-cell foam goes on the block behind the studs, which is both the insulation and the vapor retarder, so the climate zone this county sits in is answered by foam rather than by poly over fiberglass.

Under the floor comes first. Drainage, a sealed pit and a barrier are finished and running before framing starts, because everything above them is only as good as the thing they were built on. Rough-in is inspected with the walls open, and access panels go in at every shutoff and clean-out.

The bottom of a steel stud wall standing clear of a gray block basement wall, with the treated track fixed down onto the bare concrete slab.
A run of pale closed-cell spray foam covering a block basement wall, with the steel studs standing in front of it.
  • Steel framing throughout, no wood on masonry
  • Drainage and a sealed pit before any framing
  • Closed-cell foam, never fiberglass on block
  • Rough-in inspected before anything closes up
  • Egress openings sized to IRC R310, 5.7 sq ft
  • Permits filed by us, in the township that holds them

Call and somebody comes out, measures the basement and writes down what it would actually take, and that visit costs you nothing.

(717) 555-0162

Limestone, stone walls and a humid July in Lancaster

Limestone under the county puts water up through the floor rather than the wall, the older rows sit on rubble stone that is never plumb, and July dew points sweat the block.

Karst limestone under most of the county
The county sits on limestone, so groundwater travels through fissures rather than soaking evenly. A basement can be dry for six years and then take water up through the slab in one wet March, so we drain the floor rather than only coat the wall.
The older rows sit on rubble stone
The pre-1900 rows off the city grid stand on rubble stone laid up without a flat face on it. A stud line cannot be run off a wall like that, so the studs get furred and packed to a string, and the stone itself is parged before any foam goes near it.
July dew points sweat the block
Summers here run humid enough that warm air meeting cool masonry leaves a wall wet with no leak anywhere near it. That is condensation, not seepage, and it is answered with foam against the block and a dehumidifier on a drain, not with digging.

What Lancaster owners said once the basement was done

  • Rated 5 out of 5

    Smelled damp down there every summer we owned the place. They drained the floor before a stud went up, then framed and finished it. Third July down there and no smell.
    Ross K. New Holland Full Basement Finishing
  • Rated 5 out of 5

    Stone foundation, 1880s farmhouse, and the township sat on the permit two weeks longer than anyone wanted. Curt called every Friday of that wait anyway. The bar and the family room were done by August.
    Brett L. Elizabethtown Basement Bathrooms and Bars
  • Rated 5 out of 5

    My mother moved in with us in the spring, so the basement had to be an apartment by then. The stair was the part I never thought about. She has her own door at the top now and comes and goes without us.
    Joanne M. Leola Apartments and In-Law Suites

If you would rather hear it from somebody down the road, ask us for two names when we come out.

Get a free quote

Basements we have finished around Lancaster County

Six real basements from the last two years, each one with the town it is in and the thing about it that made the job awkward.

Want the basement back as a real floor?

A free measure, and the code work written down before framing.

Get a free quote

Why does one Lancaster basement cost more than the next?

Two basements the same size can land a long way apart on price, and most of the gap sits under the floor rather than in the finish you can see.

How wet it is now
Dry block with a working sump is a different job from a floor that seeps every spring. Interior drainage, a new pit and a vapor barrier mean breaking concrete and days of work before the finish.
What hangs under the joists
Ducts, waste pipes and a low main beam all have to be boxed, moved or built around. Rerouting a duct to keep head height costs more than dropping a soffit, and the code minimum decides which.
Where the bathroom goes
A bathroom below the sewer line needs an ejector pump and a sealed basin cut into the slab. Putting it where the stack already runs saves breaking concrete, which is the expensive half.
Egress, if a bedroom is in it
A bedroom below grade needs a window somebody can climb out of. That means cutting the wall, digging the well outside and having it inspected, and it is the biggest single line on such a plan.
How the walls are built
Poured concrete, block and old stone each take framing differently. The stone and brick under the older housing is rarely flat or plumb, so studs get furred and packed rather than run off the wall.
How far the finish goes
Painted board, carpet and a few can lights is one number. Trim, a wet bar, built-in cabinets, wired sound and a proper stair rail is another, and the finish is the part you can move either way.

Which of these actually apply is settled by somebody standing in the basement with a tape and a light, and that visit costs you nothing. Get a free quote

What a finished basement is worth when you sell

Square footage below grade does not count the way the floor above it does.

No published report puts a resale figure on basement finishing, and we are not going to invent one. Remodeling studies price the jobs a buyer shops for whole, a kitchen or a bath or a deck, and a basement is not one of them.

What an appraiser does instead is count the space as below-grade area and value it separately from the floors above, usually well under them.

So the question is not what percentage comes back, it is whether the room counts at all. A permitted egress window, a full bathroom, and heat and cooling taken off the house system rather than a plug-in unit are what put the space on the report. A ceiling under seven feet, a plug-in heater and any smell of damp keep it off.

A finished, furnished basement family room with a sofa, a rug, a lamp and a television on the wall, everything complete and nothing in progress.

From your first call to a signed-off room

Six to ten weeks end to end on a whole basement, and the loud, dusty part of it is over in the first two.

  1. You call and we come out

    Same day callback

    You ring, somebody calls back the same day, and we come and look. No charge for that. We measure, check the walls and floor for damp, and hear what you want down there.

  2. A plan and a written quote

    Three to five days

    We draw the basement to scale with the rooms where you want them, then price the work line by line. The drawing and the quote are yours, and nothing is booked until you say so.

  3. Permits and a start date

    Two to four weeks

    We file the drawings with Lancaster or your township and book the dates in writing. The wait is the permit office rather than us, so we tell you what it is running at.

  4. The water comes first

    Two to four days

    Before a stud goes up we deal with the wet. Drainage, a sump pit, a vapor barrier against the block and a dehumidifier run to a drain. Finish over damp and it comes back.

  5. Framing, board and finish

    Three to five weeks

    Studs held off the block, insulation behind them, then wiring and plumbing roughed in and inspected before anything closes up. Board, tape, floor, ceiling and lights follow.

  6. Signed off and swept out

    One day

    We stand with the inspector for the final visit. Then the tools go, the offcuts leave on the truck, the floor is swept, and the paperwork and the drawing are handed to you.

Ring (717) 555-0162 and somebody calls you back the same day to book a free look at the basement.

Get a free quote

One contract from bare block to a signed permit

Two crews have finished basements in Lancaster, Lititz, Ephrata and Mount Joy since 2009, about thirty a year. Moisture first, then framing, the egress window, the wiring, the ceiling height and the inspections, all under one contract with one person answering for them. A decision made down there in week one shows up as a problem in week six, which is a poor place to have two firms pointing at each other.

Call (717) 555-0162 or fill in the form and somebody will come and look at the basement. The visit is free, and the moisture plan and the code work are written down before a stud is cut.

Get a free quote

A finished basement with painted walls, a floor, recessed lighting and furniture, and an egress window in frame. No tools, no dust, no bare block.

Basement remodeling service area

The Lancaster County basements we travel to

We work Lancaster and about twenty-five miles out from it, which takes in most of the county and the near edge of York and Chester.

Primary service area

Lancaster, PA

Lancaster Basement Pros 342 N Queen St, Ste 2, Lancaster, PA, 17603 (717) 555-0162

Also serving

  • Lititz
  • Ephrata
  • Manheim
  • Mount Joy
  • Columbia
  • Millersville
  • Elizabethtown
  • New Holland
  • Leola
  • Strasburg
  • Willow Street
  • Quarryville

If your town is not on this list, ring anyway. The van is out past these most weeks and the visit still costs you nothing.

Insured
General liability and workers compensation
Established
17 years
Callback
Same day

FAQs

Frequently asked questions

Questions people ask before a basement gets booked

Can you finish a basement with only seven feet of height?

Yes, as long as the finished height holds seven feet under the joists and six foot four under a beam or a duct, which is what IRC R305 asks for. Below that the room cannot be called habitable, and the honest choices are lowering the floor, which is foundation work, or building it as storage.

Do you do foundation repair as well?

No, and we will not quote it. Piers, wall anchors and bowing block are a structural engineer's call and a foundation contractor's work, so if any of it turns up on the visit we say so and give you a name. Finishing over a wall that is still moving wastes the whole job.

What about radon? Our neighbor had a system put in.

Radon mitigation is its own trade and we do not touch it. This county tests high often enough that we tell everybody to run a test before framing starts, because a mitigation pipe is far cheaper to route through an open basement than through a finished one.

How much dust does breaking the slab make?

A lot, for about two days. The stair opening gets sealed with plastic and a zip door, a negative air machine vents out of a window, and the saw runs wet. It still finds everywhere it can, so anything stored down there needs to be out before we start.

What happens to everything we have stored down there?

It has to come out, and that part is yours. We can point you at a company that will drop a container on the drive, and if there is a corner we are not touching we will sheet it and work around it. Nothing gets carried into your garage by us.

Who does the electrical and the plumbing?

Licensed electrical and plumbing trades are brought in and they pull their own permits alongside ours. The rough-in is inspected before anything is closed up, so the panel work and the drain lines are signed off by the township while the walls are still open and anything can be moved.

Drop ceiling or a solid one? Which do people pick?

About two-thirds go solid and accept the access panels. A drop grid costs you two inches of height and looks like an office, but it comes down in a minute when a valve drips. Where a lot of plumbing runs overhead, a grid in that one bay and solid everywhere else is the usual answer.

What if a crack shows up in the new wall later?

Ring us. Seasonal movement shows at the corners of doors and openings in the first year and that is normal, so we come back and make it good once things have settled. If the crack is in the block behind the framing rather than in the finish, that is a different conversation and an engineer's.

Our basement floods every spring. Is it a lost cause?

Almost never. Water arriving at the joint between the floor and the wall is an interior drain and a pit, which is about a week of work before anything else can start. What we will not do is frame over it and hope, so if the drainage is the bigger half of the job the quote will say so.

Where do you park, and how does the concrete get out?

One truck on the drive and a trailer at the curb. Broken slab goes out in buckets up the stairs unless there is a walkout or a window big enough to take a chute. On a city row with no drive we book the street with the parking authority a few days ahead of the concrete work.

Can we do it in stages and spread it out?

Yes, and drainage first is the only order that works. Framing, board and paint can wait a year without costing you anything, but everything under the floor has to be right before any of it goes up. The usual split is water and rough-in now, finishes when you are ready.

What do we get handed over at the end?

The signed permit card, the inspection sign-offs from the township, the scale drawing marked up with anything that moved on site, and a note of where every shutoff and access panel ended up. Paint and flooring offcuts are left in a box for the touch-up you will want in year two.

Lancaster Basement Pros

We have worked on Lancaster basements since 2009 and we call back the same day.

Lancaster Basement Pros finishes basements in Lancaster, Lititz, Ephrata and the townships around them. Drainage, a sump and a vapor barrier first, then framing, board, floor, ceiling and lighting. Bathrooms, wet bars, egress windows and in-law suites too. Foundation repair and radon work go to the trades licensed for those.

Why call a basement crew and not a general builder?

  • Seventeen years of basements in Lancaster and the county around it
  • A free visit and a written quote before anything is booked
  • Steel studs held off the block, so nothing wicks into the framing
  • The water is dealt with before a single stud goes up
  • We file the permits and we stand with the inspector

Whether the basement is dry and empty or wet and full of boxes, the next move is the same. Call (717) 555-0162 and somebody rings you back the same day to arrange a look at it. You get a scale layout and a written price out of that visit, and no obligation to do anything with either.

(717) 555-0162

Give us a call

342 N Queen St, Ste 2, Lancaster, PA, 17603

Where to find us

Book a basement visit

(717) 555-0162 Get a free quote